Report from Boyd
Apr 5, 2009
It rained all day Friday,
BUT, it snowed most of Saturday! Many farms were flooded
on the way up, and all the streams and rivers were
overflowing. For some “good” reason, our road held up
very well, better than expected in my opinion.
The “Miller’s Lake” portion has a
few more potholes, dips and a few rocks showing, however.
There is a “huge” fast running stream running under
this, so we may need to look at a (better) culvert here
later.
I set up an official “Preacher’s Point
Department of Transportation” warning flag around a
rock, just before the Miller’s Lake “big hill”. I
would have taken it out completely, but my Swiss Army
knife and fingernails were getting worn out…. I’ll
bring real tools to remove it next weekend.
Apr 19, 2009
Boice Bradley gets a F,
Miller Lake portion gets a combo B to D in a few spots,
Preachers Point gets an A on the limestone crush areas and
a B minus for the rest, with a C at the top of the first
hill near Bill H.'s driveway entrance.
I spend over 4 hours working the road
yesterday and today. I got rid of the big rock that I had
stuck the flag on, and filled in several big potholes. I
also filled in the "gulley" over the culvert the
best I could. I used the leftover pit run that Blair left
at the gravel pit last year.
I need some more Advil.
So, generally the road is in good shape
for now but the
Miller section will need some proper work
this year, as expected. Four neighbours were up this
weekend.
It was sunny today but a little cool (11
degrees) and the ice is still hanging around but is going
quickly.
Apr 28, 2009
We had a crazy storm on
Saturday (Apr 25/09) with about an inch of rain in 45
minutes. This time, the gravel portion held up quite well,
the the hills with the limestone crush took a hit. I was
surprised how much of it was washed away. I am confident
that this will get fixed with a proper heading, and its OK
for driving, but the rain was horrendous!
Boice Bradley gets a F, Miller Lake
portion gets a combo B to D in a few spots, Preachers
Point gets an A on the limestone crush areas and a B minus
for the rest, with a C at the top of the first hill near
Bill's driveway entrance.
I spend over 4 hours working the road
yesterday and today. I got rid of the big rock that I had
stuck the flag on, and filled in several big potholes. I
also filled in the "gulley" over the culvert the
best I could. I used the leftover pit run that Blair left
at the gravel pit last year.
I need some more Advil.
So, generally the road is in good shape
for now but the
Miller section will need some proper work
this year, as expected. Four neighbours were up this
weekend.
It was sunny today but a little cool (11
degrees) and the ice is still hanging around but is going
quickly.
|